Projects & References

1,360 MW Thermal Plant Desalination & Ultrapure Water

Turnkey seawater desalination & ultrapure water plant for a 1360 MW thermal power plant; 880/700/300 m³/h via UF→SWRO→BWRO→MBDI secures boiler feed water

We built a turnkey (EPC) desalination and ultrapure water plant that treats Black Sea water to supply the process and boiler feed water of a 1360 MW thermal power plant — designed, manufactured, and commissioned entirely in-house.

Plant capacity:

·        880 m³/h SWRO permeate (desalinated water)

·        700 m³/h second-pass RO (BWRO) permeate

·        300 m³/h MBDI outlet ultrapure boiler feed water (< 0.1 µS/cm)

Process units: Ultrafiltration (UF) → Seawater Reverse Osmosis (SWRO) → Brackish Water Reverse Osmosis (BWRO, 2nd pass) → Degasifier → Mixed-Bed Deionization (MBDI); plus a neutralization unit for regeneration wastewater

In thermal power plants, water quality directly determines turbine and boiler life. MBDI-outlet ultrapure water prevents corrosion and scaling, keeping the plant reliable, efficient, and long-lived.

Carried out under the management of our strategic engineering partner, Aquamatch

Project Facts

SectorEnergy
LocationBlack Sea coast, Türkiye
Capacity880 + 700 + 300 m³/h
Result1,360 MW boiler feed secured

Projects & References

Other Projects

Domestic Wastewater

Caribbean — Domestic Wastewater Treatment Plants

Two domestic wastewater plants for 15,000 people on Tortola (BVI), including Burt Point; extended-aeration activated sludge and glass-fused steel tanks deliver safe discharge of treated water

Location
Caribbean
Result
safe discharge of treated water
View project
Campus / Infrastructure
36 + 108 m³/h

Bayburt University Wastewater Pumping Stations

Wastewater pumping stations (36 + 108 m³/h) on Bayburt University campus; submersible pumps and geotechnical solutions end flooding, with +35% pumping efficiency

Location
Bayburt, Türkiye
Result
35% pumping efficiency gain
View project
Municipality
22,000 m³/day

Bayburt Drinking Water Treatment Plant

22,000 m³/day turnkey drinking-water plant for Bayburt; ozonation, ultrafiltration and RO cut hardness below 15 °fH — a municipal-scale softening solution

Location
Bayburt, Türkiye
Result
Soft drinking water below 15 °fH (TS 266 compliant)
View project

Get a Quote

Quick Quote Request

Tell us about your project in a few lines; our engineers will respond with a tailored proposal.