On the Bayburt University campus, we completely renewed two
wastewater pumping (lift) stations that frequently broke down and caused
flooding — replacing them with high-capacity, reliable systems. Wastewater is
now conveyed smoothly to the main collector.
The challenge: The non-working stations caused wastewater
flooding across campus, posing hygiene and environmental-health risks. The
site's soft, slippery soil presented serious geotechnical challenges — risk of
collapse during the deep excavation required.
Our solution:
·
Two stations: 36 m³/h and
108 m³/h capacity
·
Each with "2 duty + 1
standby" submersible wastewater pumps
·
Reliable, uninterrupted
operation despite a 20 m discharge head
·
Soft soil and deep
excavation overcome through our field team's geotechnical measures and correct
construction technique
The result: Campus
wastewater flooding problems were eliminated entirely, with a modern, reliable
infrastructure and a 35% increase in pumping efficiency.