Bayburt Drinking Water Treatment Plant

22,000 m³/day turnkey drinking-water plant for Bayburt; ozonation, ultrafiltration and RO cut hardness below 15 °fH — a municipal-scale softening solution

The 22,000 m³/day plant continuously reduces the source water's 40–45 French hardness (°fH) to below 15 °fH.

Multi-stage advanced treatment:

·        Aeration + Ozonation — removal of taste, odor, and microorganisms

·        Ultrafiltration (UF) — crystal-clear water

·        Reverse Osmosis (RO) — softening by removing calcium/magnesium

·        Gas chlorine disinfection — microbiological safety across the network

The turnkey scope went beyond the plant itself: 2 fully automatic valve chambers, 1500 and 500 m³ reservoirs, 3000 m steel transmission line, pumping stations, a 2000 kVA transformer, and full automation. 

Delivered in collaboration with our strategic engineering partner, Aquamatch.

Project Facts

SectorMunicipality
LocationBayburt, Türkiye
Capacity22,000 m³/day
ResultSoft drinking water below 15 °fH (TS 266 compliant)

Projects & References

Other Projects

Domestic Wastewater

Caribbean — Domestic Wastewater Treatment Plants

Two domestic wastewater plants for 15,000 people on Tortola (BVI), including Burt Point; extended-aeration activated sludge and glass-fused steel tanks deliver safe discharge of treated water

Location
Caribbean
Result
safe discharge of treated water
View project
Campus / Infrastructure
36 + 108 m³/h

Bayburt University Wastewater Pumping Stations

Wastewater pumping stations (36 + 108 m³/h) on Bayburt University campus; submersible pumps and geotechnical solutions end flooding, with +35% pumping efficiency

Location
Bayburt, Türkiye
Result
35% pumping efficiency gain
View project
Industrial Process
Fully automatic dosing

Cooling Tower pH Control & Dosing Unit

Fully automatic pH control & chemical dosing unit for a cooling tower; SCADA-controlled industrial dosing preventing corrosion and scaling by holding pH within ±0.1 of set-point

Location
Türkiye
Result
pH held within ±0.1 of set-point