Site Installation & Commissioning

On-site electromechanical assembly, site acceptance tests (SAT), performance guarantee tests and operator training at commissioning.

What is it?

Site installation and commissioning is the final stage in which completed equipment, piping, panels and automation systems are assembled onsite and proven through performance tests to operate at guaranteed output values. It is the critical turning point where your plant moves from a design on paper to a real, operating system.

Technical Scope

  • Electromechanical installation (equipment, piping, panel connections)
  • Functional testing, site acceptance testing (SAT) and performance guarantee testing
  • Onsite verification of guaranteed output values
  • Operator training and handover of operating documentation

Typical Process Flow

  1. 01 Site preparation and material delivery
  2. 02 Mechanical and electrical installation
  3. 03 Functional tests and leak checks
  4. 04 Site acceptance testing (SAT), performance guarantee tests and guaranteed-value verification
  5. 05 Operator training and operational handover

Frequently Asked Questions

Do you work with your own team during installation?

We manage the process with our own teams and with solution partners with whom we have long-standing trusted relationships.

Do you provide operator training after commissioning?

Yes; we provide comprehensive training and operating documentation to the personnel responsible for daily operation.

What happens if performance tests do not reach target values?

We carry out required optimisations until guaranteed output values are achieved; handover occurs only when performance tests are completed successfully.