Bayburt University Wastewater Lift Stations

We renewed two wastewater lift stations on the Bayburt University campus, achieving a 35% increase in pumping efficiency.

The campus's two existing lift units failed frequently, caused wastewater overflows and posed risks to hygiene and environmental health. We replaced them with high-capacity, reliable stations that convey wastewater to the main collector without interruption.

The stations, at two different locations, were designed to match their capacity requirements:

·        Two stations: 36 m³/h and 108 m³/h

·        Submersible wastewater pumps in a "2 duty + 1 standby" configuration at each station

·        Continuous operation at a 20 m pumping head

·        35% increase in pumping efficiency

The soft, slippery ground on site posed a serious risk of collapse during deep excavation. Our site team carried out excavation and installation safely, applying geotechnical measures and appropriate construction techniques.

With the renewed stations, wastewater-related overflows and flooding on campus have been eliminated; wastewater is now collected and conveyed to the main sewer system through modern, reliable infrastructure. The project demonstrates our ability to manage and deliver infrastructure projects under challenging site conditions.

Project details: Projects › Bayburt University Wastewater Lift Stations

Back to all news

Get a Quote

Quick Quote Request

Tell us about your project in a few lines; our engineers will respond with a tailored proposal.